From 2025-01-23 to 2025-02-08 is the Chinese new year holiday, the international shipping company will stop working during that
time.
As it takes 2-5 days from supplier to our warehouse. The orders after 2025-01-16(23:59 UTC+8) will be processed on 2025-02-08
3 total control (standard section) total control (standard sum) Total length 0 5 m 1 m-3 3 Total control (standard section) Total length 1 m 3 plug-in total control (standard section) Total length 2 m-3 plug-in total control (standard section) total control (standard section) Total length 3
Number of jacks:
6 six in six.
The line is long.:
1 8 of 8
The production enterprise:
Shenzhen Green Union Technology Co., Ltd.
Is there a switch or not?:
There is a
The land of the purchase:
The Chinese mainland
Choose region:
Choose shipping method:
Items weight estimation 0 g, subject to actual weight
Calculated shipping includes heavy logistics. Order more, shipping costs will reduce
to 50% discounts!
You can advise shipping services including DHL, ocean shipping, UPS, Fedex, pls contact us!