From 2025-01-23 to 2025-02-08 is the Chinese new year holiday, the international shipping company will stop working during that
time.
As it takes 2-5 days from supplier to our warehouse. The orders after 2025-01-16(23:59 UTC+8) will be processed on 2025-02-08
A3 A4 drawing paper Large sheet A0 A1 A2 Engineering drawing paper 180g g Architectural design drawing paper White paper Mike pen paper Animation hand-copied newspaper sketch Color pencil drawing paper Student