From 2025-01-23 to 2025-02-08 is the Chinese new year holiday, the international shipping company will stop working during that time.
As it takes 2-5 days from supplier to our warehouse. The orders after 2025-01-16(23:59 UTC+8) will be processed on 2025-02-08

Copper mirror studs Mirror studs Mirror buckles Decorative nails Decorative lid Gold silver brushed Specifications are complete

New item added to your Shopping Cart
You now have 10 items in your Shopping Cart.
 
FacebookTwitterGooglePinterestStumbleUpon
 
Color classification:
Khaki ginger yellow bright yellow apricot lemon yellow orange light yellow fluorescent yellow sky blue royal blue 10mm arc silver pack 20 10 mm flat brushed one pack 20 10 mm arc surface gold a pack 20 12 mm arc surface silver pack 20 12 mm arc surface silver pack 20 12 mm arc gold pack 20 12 mm arc gold pack 20 14 mm arc silver pack 20 14 mm flat brushed a pack 20 14 mm flat brushed a pack 20 14 mm arc gold pack 20 16 mm arc silver a pack 10 16 mm arc gold a pack 10 16 mm arc gold a pack 10 18 mm arc silver a pack 10 18 mm plane brushed one Pack 10 18mm curved surface gold pack 10 20mm arc surface silver pack 10 20mm plane brushed pack 10 20mm arc surface gold pack 10 22mm arc surface silver pack 10 22mm plane brushed one pack 10 22mm curved gold pack 10 25mm arc silver pack 10 25mm plane brushed pack 10 25mm curved gold pack 10 pcs
Choose region:
Choose shipping method: